| Premises |
London EC3 |
 |
| Size |
68,000 sq.ft. |
 |
| Timescale |
14 weeks |
 |
 Scope of works included
- Purpose made timber partitioning system
- Air conditioning and ventilation amendments
- Specialist joinery
- New telephone system
- Flooring
- Security/access control
- Full catering kitchen
- Blinds
- Electrical and lighting installation
- Furniture
- Removals
- Voice and data installation
- Dining suites
Client comment
Stephen Burns, Operations Director of top Lloyds syndicate Limit
said:
"The most demanding pre-contract challenge for the Maris design team
was coming up with a scheme flexible and efficient enough to provide
us with the best possible usage of the floors we want to fill now,
but which promises to make the transition into the extra space as
painless as possible.
"It called for a lot of ingenuity as well as a commitment to
providing us with numerous variations. We are delighted that we
chose Maris from the various companies which presented their views." |

 |